Skip to content

Final Activities Before Store Fixturing

July 26, 2011

Grand Atrium to Grundy Town Center

Window cleaning crews have a unique challenge in applying the final shine at the Grundy Town Center. The Atrium window wall is close to 40 feet high, so specialized equipment was brought on site in order to reach these heights.

Hydro-Seeding and Mulching Operation

Application of grass seed in landscaped areas is done by the use of specialized commercial hydro-seeding trucks. This process sprays a mixture that includes grass seed, fertilizer and mulch in one application. The use of water in spreading these materials also gives the seed a boost in these hot July temperatures.

Striping of the Parking Lot

In addition to over 500 parking spaces located in the two level parking deck, The Grundy Town Center also offers parking in excess of 150 spaces for the ground level retail shops.

Ground Level Retail Shops

Work has been released for the build-out of the ground level retail shops. Crews arrived this week for the installation of signs. This offers a glimpse of the future retail stores to come.

About these ads
2 Comments leave one →
  1. suzy permalink
    July 28, 2011 8:53 pm

    SHOULD HAVE LEFT GRUNDY ALONE,…THEIR IS NOTHING THERE,..IT IS A GHOST TOWN NOW…..

    • stpgrundy permalink*
      August 1, 2011 9:16 am

      Very sorry to hear you feel this way, Suzy. We truly believe we have made Grundy safer and more convenient for the community. It is our hope that the finished Town Center will change your mind. Regardless, thank you for your input.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

%d bloggers like this: