Final Touches Before Store Fixturing at the Grundy Town Center

July 19, 2011

Installation of the Cardboard Bailer

The cardboard bailer for the anchor retail store was received this week. This bailer will compact cardboard boxes in bails to save space and allow for recycling.

Installation of Trash Compactor

The trash compactor was received and installed outside the loading dock at Grundy Town Center.

Guardrail Installation

A guardrail system is being installed along the parking lot adjacent to the slope of the Levisa River. The guardrail will protect vehicles that park along the riverbank.

Used Cooking Oil Grease Tank

All used cooking oil from the third level retail store will be stored in this tank until pumped into a truck for recycling.

Tile Work in the Atrium

Floor tile crews were on-site this week completing tile installation on all levels of the entrance atrium.

Refrigerated Cases in Third Level Retail Store

Remaining food & deli refrigerated cases were received and set into place this week. This completes the layout of grocery refrigerated cases.

About these ads
One Comment leave one →
  1. Mickey McGlynn permalink
    October 3, 2011 9:55 am

    I would like to know the source of the group photo of children which you have on the “Raising Grundy” video. It is my belief that I am one of those children and I would like to obtain a copy of this picture. Thank you. Please e-mail me at patperson@mail.com.

    Mickey

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

%d bloggers like this: